Public Works Department Standards
Contents
This Public Works Standards Manual is established pursuant to City of Sedro-Woolley Ordinances, Resolutions and the Sedro-Woolley Municipal Code, which authorize the Public Works Director / City Engineer to promulgate and adopt administrative standards and specifications to implement and enforce code requirements applicable to surface water drainage facilities, utilities, and right-of-way improvements within the City of Sedro-Woolley.
Accordingly, the guidelines, standards and specifications contained in this manual apply to the engineering and construction of all streets and utilities established and/or improved within the City.
For the complete introduction click on the following link:
INTRODUCTION
1.1 - GENERAL
1.2 - DEFINITIONS
1.3 - REQUIREMENTS
1.4 - PERMITS AND APPROVALS
1.5 - HOURS OF CONSTRUCTION
1.6 - CONSTRUCTION SEASON
2.1 - RESPONSIBILITY OF OWNER/DEVELOPER
2.2 - FEES
2.3 - BONDING
2.4 - EASEMENTS
2.5 - TRAFFIC CONTROL
2.6 - CALL BEFORE YOU DIG
2.7 - EMERGENCY WORK POLICY FOR PRIVATE UTILITIES
3.1 - GENERAL CONSIDERATIONS
3.2 - STREETS
3.3 - SIDEWALKS AND CURBS
3.4 - BIKEWAYS
3.5 - PLANTER STRIP
3.6 - ILLUMINATION
3.7 - SIGNALS
3.8 - ROADSIDE FEATURES
3.9 - PARKING
4.1 - GENERAL REQUIREMENTS AND POLICIES
4.2 - ANALYSIS
4.3 - CONVEYANCE SYSTEMS
4.4 - STORMWATER QUALITY TREATMENT
4.5 - STORMWATER CONTROL REQUIREMENTS
4.6 - TEMPORARY EROSION AND SEDIMENT CONTROL (TESC)
5.1 - GENERAL REQUIREMENTS AND POLICIES
5.2 - SANITARY SEWER PLANS
5.3 - SANITARY SEWER CONSTRUCTION
6.1 - GENERAL REQUIREMENTS AND POLICIES
7.1 GENERAL REQUIREMENTS AND POLICIES
STANDARD DETAILS
STANDARD NOTES
REVIEW CHECKLISTS
BOND WORKSHEETS
LEGAL DOCUMENTS
FEE SCHEDULE
Standards Manual - Full Version (Chapter 1 - 7)
Public Works Department Standards
Chapter 1 - Administration
1.1 - GENERAL
1.2 - DEFINITIONS
1.3 - REQUIREMENTS
1.3.1 - Frontage Improvements in General
1.3.2 - Streets
1.3.3 - Franchise Utilities
1.3.4 - Bikeways and Walkways
1.3.5 - Sidewalks, Planting Strips and Medians
1.3.6 - Sewer and Water
1.3.7 - Stormwater Drainage
1.3.8 - Solid Waste and Recycling
1.3.9 - Modification
1.3.10 - Frontage Improvement Modification
1.3.11 - Reimbursement Areas
1.4 - PERMITS AND APPROVALS
1.4.1 - General
1.4.2 - Development Permits and Approvals
1.4.3 - Environmental Approvals
1.4.4 - Land Use Permits
1.4.5 - Excavation and Grading Permits
1.4.6 - Building Permits
1.4.7 - Subdivisions
1.4.8 - Right-of-Way Permits
1.4.9 - Pre-Construction Meeting
1.4.10 - Project Finalization
1.4.11 - Reimbursement Areas
1.5 - HOURS OF CONSTRUCTION
1.6 - CONSTRUCTION SEASON
Public Works Department Standards
Chapter 2 - General Public Works Requirements
2.1 - RESPONSIBILITY OF OWNER/DEVELOPER
2.1.1 - Standard Specifications
2.1.2 - Shortened Designation
2.1.3 - Applicability
2.1.4 - Design Standards
2.1.5 - Minimum Plan Elements
2.1.6 - Drafting Standards
2.1.7 - Plan Review
2.1.8 - Pre-Construction Meeting
2.1.9 - Construction Control
2.1.10 - Inspection
2.1.11 - Protection of Public and Private Utilities
2.1.12 - Damage to Private Property and Improvements
2.1.13 - Final Inspection
2.1.14 - Final Acceptance
2.1.15 - Maintenance of Work after Acceptance
2.1.16 - Samples and Tests
2.2 - FEES
2.3 - BONDING
2.4 - EASEMENTS
2.5 - TRAFFIC CONTROL
2.6 - CALL BEFORE YOU DIG
2.7 - EMERGENCY WORK POLICY FOR PRIVATE UTILITIES
Public Works Department Standards
Chapter 3 - Transportation
3.1 - GENERAL CONSIDERATIONS
3.2 - STREETS
3.2.1 - General
3.2.2 - Design Standards
3.2.3 - Naming and Numbering
3.2.4 - Signing and Striping
3.2.5 - Right-of-Way
3.2.6 - Private Streets
3.2.7 - Street Frontage Improvements
3.2.8 - Half Street
3.2.9 - Medians
3.2.10 - Intersections
3.2.11 - Street Layout
3.2.12 - Alleys
3.2.13 - Driveways
3.2.14 - Sight Obstructions
3.2.15 - Surfacing Requirements
3.2.16 - Road and Sidewalk Cuts
3.2.17 - Trench Backfill and Restoration
3.3 - SIDEWALKS AND CURBS
3.3.1 - Design Standards
3.3.2 - Sidewalks
3.3.3 - Curb
3.3.4 - Curb Access Ramps
3.3.5 - Staking
3.3.6 - Testing
3.4 - BIKEWAYS
3.4.1 - Design Standards
3.5 - PLANTER STRIP
3.5.1 - Street Trees
3.6 - ILLUMINATION
3.6.1 - General
3.6.2 - Design Standards
3.6.3 - Staking
3.6.4 - Testing
3.7 - SIGNALS
3.7.1 - General
3.7.2 - Design Standards
3.7.3 - Induction Loops
3.7.4 - Staking
3.7.5 - Testing
3.7.6 - Check-Out Procedure
3.8 - ROADSIDE FEATURES
3.8.1 - General
3.8.2 - Design Standards
3.8.3 - Staking
3.8.4 - Testing
3.8.5 - Survey Monuments
3.8.6 - Bus Shelter and Amenities
3.8.7 - Mailboxes
3.8.8 - Guardrails
3.8.9 - Retaining Walls
3.8.10 - Parking Lots
3.8.11 - Transportation Impact Study and Mitigation
3.8.12 - Roadside Obstacles
3.9 - PARKING
3.9.1 - General
Public Works Department Standards
Chapter 4 - Storm Drainage
4.1 - GENERAL REQUIREMENTS AND POLICIES
4.1.1 - Drainage Review
4.2 - ANALYSIS
4.2.1 - Stormwater and Design Report (SDR)
4.2.2 - Downstream Analysis
4.3 - CONVEYANCE SYSTEMS
4.3.1 - Pipe Specifications
4.3.2 - Catch Basins
4.3.3 - Bridges
4.4 - STORMWATER QUALITY TREATMENT
4.4.1 - Storm Water Facilities within Wetlands, Streams
and Associated Buffers
4.4.2 - Water Quality Improvements for Redevelopment Projects
4.4.3 - Timing of Installation
4.4.4 - Requirements for Incremental Construction
4.4.5 - Extent of Improvements Under Incremental Construction
4.4.6 - Approval of Underground Water Quality Facilities
4.4.7 - Bioswale Construction
4.4.8 - Bioretention (Rain Gardens)
4.5 - STORMWATER CONTROL REQUIREMENTS
4.5.1 - Retention/Detention (R/D) Facility Design
4.5.2 - Existing Conditions
4.5.3 - Approval of Underground Detention Facilities
4.6 - TEMPORARY EROSION AND SEDIMENT CONTROL (TESC)
4.6.1 - TESC Plan
Public Works Department Standards
Chapter 5 - Sanitary Sewer
5.1 - GENERAL REQUIREMENTS AND POLICIES
5.1.1 - Sanitary Sewer Requirements
5.1.2 - Gas Stations
5.1.3 - Septic System Decommissioning
5.1.4 - On-Site Septic Systems
5.2 - SANITARY SEWER PLANS
5.2.1 - Sanitary Sewer Plan Requirements
5.2.2 - Certified As-Built Plans
5.3 - SANITARY SEWER CONSTRUCTION
SUPPLEMENT - SEWAGE LIFT STATIONS
Public Works Department Standards
Chapter 6 - Solid Waste
6.1 - GENERAL REQUIREMENTS AND POLICIES
6.1.1 - Solid Waste Enclosure Standards
Public Works Department Standards
Chapter 7 - Water
7.1 GENERAL REQUIREMENTS AND POLICIES
7.1.1 - Water Plan Set Standards
7.1.2 - Fire Hydrant Requirements
Public Works Department Standards
Appendix
STANDARD DETAILS
STANDARD NOTES
General Notes
Roadway Notes
Drainage Notes
Sewer Notes
Erosion/Sedimentation Control Notes
Sample Construction Sequence
DEVELOPMENT REVIEW
Engineering Review Checklist
Stormwater and Design Report (SDR) Review Checklist
Commercial Land Use Review Checklist
Short Plat Review Checklist
Preliminary Plat Review Checklist
Final Plat Review Checklist
As-Built Review Checklist
Boundary Line Adjustment (BLA) Review Checklist
Internal Boundary Line Elimination (BLE) Review Checklist
Binding Site Plan Review Checklist
Project Construction Checklist
Biofiltration Swale Calculation Worksheets
Pre-Construction Meeting Form
Traffic Impact Study Guidelines
BOND WORKSHEETS
Agreement and Performance/Maintenance Bond
Assignment of Funds in Lieu of Bond
Bond Quantities Price Schedule
Performance Bond Quantities Worksheet
Maintenance Bond Quantities Worksheet
LEGAL DOCUMENTS
Drainage Release Covenant
Declaration of Covenant
FEE SCHEDULE - Effective 10/5/2009
TREES
Public Works Department Standards
Appendix
- Sample Item 1- mmm dd, yyyy
- Sample SubItem1
- Sample SubItem2
- Sample SubItem3
- Sample Detail1
- Sample Detail1
- Sample Item 2- mmm dd, yyyy
- Sample SubItem1
- Sample SubItem2
- Sample SubItem3
- Sample Detail1